Jacksonville Electric Authority (Jacksonville, Fla.)
Label
Jacksonville Electric Authority (Jacksonville, Fla.)
Name
Jacksonville Electric Authority (Jacksonville, Fla.)
Actions
Incoming Resources
- Contributor of18
- Site selection study, [final report], prepared for Jacksonville Electric Authority ; prepared by United Engineers & Constructors, Inc
- JEA Brandy Branch combined cycle conversion, JEA Branch Branch sufficiency response
- Long range generation planning study, [final report], prepared for Jacksonville Electric Authority ; prepared by United Engineers & Constructors, Inc
- Seminole plant, Keystone, JEA Firestone 230 kv transmission line application for corridor certification, submitted to Florida Department of Environmental Regulation ; submitted by Seminole Electric Cooperative, Inc. and Jacksonville Electric Authority ; [prepared by Environmental Consulting & Technology, Inc., and Moore/Bowers in association with Seminole Electric Cooperative, Inc., Jacksonville Electric Authority and Hopping, Boyd, Green & Sams.]
- Fuel study, [final report], prepared for Jacksonville Electric Authority ; prepared by United Engineers & Constructors, Inc
- Report on proposed power plant sites: review and evaluation., Prepared for Jacksonville Electric Authority
- Geochemistry and origins of mineralized waters in the Floridan aquifer system, Northeastern Florida, by G.G. Phelps ; prepared in cooperation with the City of Jacksonville, Jacksonville Electric Authority and the St. Johns River Water Management District
- Report on executive summary: long-range generation planning study., Prepared for Jacksonville Electric Authority
- Report on economic selection of future generation project., Prepared for Jacksonville Electric Authority
- Report on technical and economic feasibility of generation alternatives., Prepared for Jacksonville Electric Authority
- Report on system demand and energy forecast., Prepared for Jacksonville Electric Authority
- An aquifer-test preprocessor for the ground-water flow model calibration program MODOPTIM and its application to a well field in Duval County, Florida, by Nicasio SepĂșlveda ; prepared in cooperation with the Jacksonville Electric Authority, St. Johns River Water Management District
- JEA Brandy Branch combined cycle conversion, site certification application
- Report on technical and economic feasibility of generation alternatives., Prepared for Jacksonville Electric Authority
- Long range generation planning study, Black & Veatch
- Geochemistry and origins of mineralized waters in the Floridan aquifer system, Northeastern Florida, by G.G. Phelps ; prepared in cooperation with the City of Jacksonville, Jacksonville Electric Authority and the St. Johns River Water Management District
- Annual water quality report
- Draft environmental impact statement for proposed issuance of a new source National Pollutant Discharge Elimination System Permit, Florida state analysis report for proposed certification by the Governor and Cabinet to Jacksonville Electric Authority, St. Johns River Power Park, jointly prepared by U.S. Environmental Protection Agency and Florida Department of Environmental Regulation
- Creator of15
- Quarterly report, Jacksonville Electric Authority
- Site certification application, informational document for Jacksonville Electric Authority, St. Johns River Power Park, units 1 & 2, by Jacksonville Electric Authority, City of Jacksonville, Florida
- Jacksonville Electric Authority, Florida, Electric Revenue Certificates, $48,000,000, series of 1973, third installment
- Official statement: $36,000,000 Jacksonville Electric Authority Electric Revenue Certificates., 2nd series of 1973, first installment to be offered for sale December 11, 1973 at 11 a. m., E. S. T
- 100 years of service, a brief history of municiplly-owned electric service in the City of Jacksonville, 1996
- Yesterday, today, tomorrow, Jacksonville Electric Authority
- Professional services guidelines for engineering services for a fossil fuel electric generating unit, Jacksonville Electric Authority
- Underground electric facilities feasibility study, prepared for City Council of Jacksonville, Jacksonville Electric Authority
- Official statement: $20,000,000 Jacksonville Electric Authority Electric Revenue Certificates, series of 1973, first installment, to be offered for sale October 28, 1975 at 11 a. m., E. S. T
- Ten-year site plans of electrical generating facilities and associated transmission lines, Jacksonville Electric Authority
- Spanning 100 years of service, 1895-1995
- Annual report
- Jacksonville Electric Authority, Electric Revenue Certificates, Official statement, $45,000,000, series of 1973, second installment, to be offered for sale January 25, 1977 at 11 a. m., E.S.T
- New generation project site study, identification of six preferred sites, Jacksonville Electric Authority
- Jacksonville Electric Authority, Florida, Electric Revenue Certificates, $48,000,000, series of 1973, third installment with amendment
- Focus of2