Jacksonville Public Library

Feasibility study of economics and performance of solar photovoltaics at the Kerr McGee site in Columbus, Mississippi, a study prepared in partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative, siting renewable energy on potentially contaminated land and mine sites, Joe Simon and Gail Mosey

Label
Feasibility study of economics and performance of solar photovoltaics at the Kerr McGee site in Columbus, Mississippi, a study prepared in partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative, siting renewable energy on potentially contaminated land and mine sites, Joe Simon and Gail Mosey
Note
Title from title screen (viewed on Apr. 29, 2013)"January 2013.""Produced under direction of the U.S. Environmental Protection Agency (EPA) by the National Renewable Enery Laboratory (NREL) under Interagency Agreement IAG-09-1751."
Color
mixed
Form Of Item
online
resource.govDocClassificationNumber
E 9.16:NREL/TP-7 A 30-57251
resource.gpoItemNumber
0430-P-03 (online)
Physical Description
1 online resource (viii, 38 pages), illustrations (some color).
Specific Material Designation
remote
System control number
(Sirsi) o841282269
Access location
Carrier category
Media category